Megger Pil 8 Cable & Phase Identifier
Zoom image

Megger Pil 8 Cable & Phase Identifier


Not rated yet

Such safety measures take a lot of effort and are not always practical. PIL 8 requires that the ground or shorting must not be removed. On the contrary, this grounding is an essential part of the procedure, which means, the cable must be grounded and shorted for the system to work with the result that test is absolutely safe. For each phase the corresponding transceiver clamp is installed on the grounded cable end and then at the selection point each phase is identified and marked.

  • د.ك0.000KWD
Qty:  
In stock (1000 items available)
OR
  • Maintenance free transceiver clamps
  • Suitable for any type of switchgear
  • Requires only one person
  • Easiest operation
  • Absolute safe phase identification
    • SKU
      Megger Pil 8
  • Brand
    Megger
Customer reviews
Please sign in to add review
There are no comments yet. Be the first to leave a comment